The 1000 litre tank is the smallest tank we build, and the one we use most for training. It is big enough to be useful for a household’s drinking water and small enough that a group can finish the structural work in a day or two. The stages below describe the general method; sizes and quantities are adjusted on site.
Three ways to shape the tank
We build the 1000 litre tank in three versions, each suited to different skills and materials:
- Without joints, with the help of form work: the mesh is wrapped around a temporary drum-shaped mould and plastered in one piece.
- With joints, using pre-cast rings: three rings about 4 ft in diameter are cast first and stacked, and the joints are sealed.
- Without form work: the mesh cage is made stiff enough to stand on its own and is plastered directly.
Stage 1: the base
Choose firm, level ground close to the roof down pipe. Cast a circular base slab a little larger than the tank, with mesh in it, and leave mesh bars turned up around the edge so the wall can be tied to the floor. Fix the outlet pipe in the base or low in the wall now; drilling later weakens the tank.
Stage 2: the mesh frame
Bend weld mesh into a cylinder and tie it to the starter mesh of the base. Tie chicken mesh tightly on both the inside and the outside of the weld mesh. Loose chicken mesh is the most common fault, because it leaves voids in the mortar.
Stage 3: mortar from both sides
First coat
Apply cement sand mortar from one side and press it through the mesh while a helper holds a flat board on the other side. Work in a continuous band around the tank.
Second coat and finishing
Plaster the second face so that the mesh is fully covered on both sides, then finish the inside smooth, ideally with a cement slurry coat to help water-tightness. Round off the corner where the wall meets the floor.
Stage 4: the roof
A domed or flat ferro cement roof is cast over a temporary support, with a manhole and cover, an inlet for the down pipe and a screened overflow.
Stage 5: curing and fittings
- Keep the tank continuously wet for at least two weeks: wet gunny bags around the outside and a little water inside.
- Fill slowly the first time and check for damp patches; seal them from inside while the tank is new.
- Fit the tap a few centimetres above the floor and a first-flush pipe at the inlet.
Students who built tanks with us at the NSS camp at Golap and the IIT Bombay NSS activity followed exactly these stages. If you would like a training session for your group, see Contact Us.




